✨ New Arrivals Just Dropped!Explore
HomeStore

LNER West Riding Limited Double Open First Articulated Coach Pack

Product image 1
Product image 2
Product image 3
Product image 4
Product image 5
Product image 6
Product image 7
Product image 8

LNER West Riding Limited Double Open First Articulated Coach Pack

LNER West Riding Limited Double Open First Articulated Coach Pack

Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937.

A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality.

The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.

Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station.

The next vehicles in the rake are coaches ‘C’ and ‘D’ and these comprise of two identical first class open coaches which offered enhanced comfort and also had a lavatory at each end. These coaches are the ones presented in this highly detail OO gauge coach pack.

What's Inside

  • 2x Model Passenger Coach
  • 1x Accessory Pack
$181.38
LNER West Riding Limited Double Open First Articulated Coach Pack
$181.38

Product Information

Shipping & Returns

Description

Following the success of the LNER’s newly-introduced ‘Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937.

A new set of carriages was built that was identical to the ‘Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ‘West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality.

The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ‘A4’ No. 4492 ‘Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.

Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station.

The next vehicles in the rake are coaches ‘C’ and ‘D’ and these comprise of two identical first class open coaches which offered enhanced comfort and also had a lavatory at each end. These coaches are the ones presented in this highly detail OO gauge coach pack.

What's Inside

  • 2x Model Passenger Coach
  • 1x Accessory Pack

You may also like

NEW
Thumbnail 1Thumbnail 2

Virgin HST Mk3 Coach TS 42176

$46.36

NEW
Thumbnail 1Thumbnail 2

Virgin HST Mk3 Coach TS 42175

$46.36

NEW
Thumbnail 1Thumbnail 2

GNER HST Mk3 TS 42241

$46.36

NEW
Thumbnail 1Thumbnail 2

GNER HST Mk3 Coach TFD 41118

$46.36

NEW
Thumbnail 1Thumbnail 2

Pullman 1st Class Kitchen Rosamund

$64.43

NEW
Thumbnail 1Thumbnail 2

Pullman Third Class Brake Car No54 Third class

$64.43

NEW
Thumbnail 1Thumbnail 2

Pullman 1st Class Kitchen Cynthia

$64.43

NEW
Thumbnail 1Thumbnail 2

GNER HST Mk3 Coach TF 41170

$46.36

NEW
Thumbnail 1Thumbnail 2

GNER HST Mk3 TGS 44098

$46.36

NEW
Thumbnail 1Thumbnail 2

GNER HST Mk3 TS 42244

$46.36

NEW
Thumbnail 1Thumbnail 2

GNER HST Mk3 TS 42242

$46.36

NEW
Thumbnail 1Thumbnail 2

GNER HST Mk3 Coach 1 TRFB 40720

$46.36

LNER West Riding Limited Double Open First Articulated Coach Pack | Rails